Ingredients & Pre-treatment
1.Dissolving and Mixing
- Add a measured amount of warm water (usually 40-50'C) into the mixing tank.
- Follow the principle of solids first,liquids later;minor ingredients first,major ingredients later.The typical sequence is:first dissolve sugar,milk powder,ect.Premix stabilizers and emulsifiers with part of the sugar,then add slowly while stirring at high speed to prevent agglomeration.Finally add liquid cream,flavorings,etc.
- Mix evenly to form a homogeneous slurry with no visible particles.
2.Pasteurization and Homogenization
- Heat the mixture for pasteurization.Typical process:85'c+-2'C,holding for 15-30 seconds to kill pathogenic bacteria and reduce the total microbial count.
- Immediately pump the sterilized mixture into a homogenizer.Homogenization is usually performed in two stages(e.g.,15-20 Mpa for the first stage,3-5 Mpa for the second stage) to break down fat globules,refine texture,prevent fat separation,and improve stability.
3.Cooling and Aging (Maturing)
- Rapidly cool the homogenized mixture to 0-4'C via a heat exchanger.
- Pump into an aging tank and stir slowly at this temperature for 2-24h.This process allows fat crystallization,full hydration of proteins and stabilizers,increased viscosity,and improved overrun,meltdown resustance and mouthfeel.
Freezing,Forming and Hardening
1.Freezing (Overrun)
- Feed the aged mixture into a continuous freezer.Air is incorporated under low temperature and high shear to form a semi-solid ice cream structure.
2.Molding,Stick Inserting,Freezing and Demolding (for Popsicles/Ice Cream Bars)
- Molding:Fill the frozen mixture into sanitized molds.
- Stick inserting:Automatic stick inserter places sticks into the center of each product.
- Primary freezing:Molds enter a -20 to -25'C freezing tank or quick-freezing tunnel until the product core is fully frozen and set.
- Demolding:Immerse molds in room-temperature water for several seconds to slightly melt the surface for easy release.
Packaging and Warehousing
1.Inspection and Packaging
- Metal detection:Reject products containing metal foreign bodies.
- Weight sorting:Reject products that do not meet net weight requirements.
- Automatic packaging:Primary bagging and outer cartoning,with automatic printing of production date and batch number.
2.Boxing and Warehousing
- Pack,seal and label cases manually or by robotic arm.
- Palletize and transfer promptly to finished goods cold storage at -18'C or bellow
- Maintain constant storage temperature;store by batch and category following the First-In-First-Out(FIFO) principle.
Post-Production Procedures
1.Equipment Cleaning and Sanitization
- Clean mixing tanks,pipelines,homogenizer,freezer,filler,molds,etc.,via CIPor on-site cleaning:alkaline wash->acid wash->fresh water rinse to ensure no residue.odor or microbial risk.
- Disassembled parts such as molds,stick inserters and conveyor rails are cleaned separately,drained,sanitized and stored foe reuse.
2.Site Cleaning
- Clean floors,worktables and drains;remove waste,packaging debris and ice residues.
- Arrange tools and containers in designated areas to keep the production area tidy.
3.Materials and Records
- Seal,return to cold storage or dispose of leftover raw and auxiliary materials as required,with proper labeling.
- Complete production records:batch,output,process parameters,pasteurization records,homogenization pressure,aging time, abnormalities,etc.
4.Equipment Inspection and Shutdown
- Close water,electricity,air and refrigerant valves;check for leaks,abnormal noise or wear.
- Shut down and power off according to procedures;complete equipment maintenance and shift handover records.
5.Environment and Safety
- Turn on workshop UV lamps or conduct environmental sanitization as required.
- Confirm fire-fighting and emergency equipment are in good condition;complete safety inspection before leaving the post.